New Solar Energy Battery Assembly Project with Annual Production Capacity of 50MW in Luanping County
项目基本情况。该项目生产的晶体硅太阳能电池片及组件是适应绿色能源、清洁能源的发展趋势,响应国家扶持新能源发展的政策。项目的实施还可促进国内光伏产业结构的调整和技术升级,提高国内太阳能电池片的技术档次,有力调整滦平县产业结构。该项目建设包括生产车间、动力厂房、原料库、办公科研楼、职工食堂、职工倒班宿舍等,建筑面积约为50000㎡,投产后可年产100MW太阳能电池组件,主要产品为125*125、156*156太阳能晶硅电池片。项目建设期为2年,建设投资14000万美元,建筑工程费用3000万美元,设备购置费用8600万美元,安装工程费用200万美元,其他工程费用2200万美元,投资回收期(含建设期,所得税后)为6年;年实现销售收入60000万美元,年利润总额6000万美元。全部资金由企业自筹。
Fundamental Information of Project. The crystalline silicone solar battery plate and assembly manufactured by the Project echoes with the development trend of green energy and clean energy as well as the national policies of supporting the development new energy. The application of the Project can regulate domestic voltaic industry structure upgrade its technology, improve domestic solar battery plate technology and comprehensively regulate industrial structure of Luanping County. The Project will include a production workshop, dynamics workshop, raw materials warehouse, research office building, dining hall for staff and staff dorm. The Project covering a construction area of about 50,000sqm can produce solar battery assembly of 100MW annually, mainly including 125*125 and 156*156 solar crystal silicon battery assembly. The construction time of the Project is 2 years, the construction investment totals USD140million, the construction cost is USD30million, cost for purchasing devices is USD86million, cost for installation project is USD2million, and cost for other projects is USD22million. The investment recovery period (including construction time after tax) is 6 years. Annual sales income is USD600million, the total annual profit is USD60million. All funds shall be collected by enterprises themselves.
建设条件:项目拟选址在承德张百湾新兴产业示范区内,该区交通便利,紧邻国道112线,距滦平县城10公里、京承高速滦平出口23公里,到北京仅1个半小时车程;京通铁路和正在建设的张唐铁路经过园区,并在区内设有客货两用站;水资源充沛,滦河流经27公里,径流量19立方米/秒;浅层地下水即可实现园区近期供水,规模为10万吨/日的供水厂正在建设中;区内现有35KV、110KV、220KV变电站各一座,承德西500KV变电站和园区专用35KV变电站即将建成投入使用;天然气管道在区内建设中转站一座、门站五个;现有处理能力为2万吨/日的污水处理厂一座,并可提供中水回用,规划建设处理能力为16万吨/日的第二污水处理厂1座,一期6万吨/日工程已开工建设。
Construction Conditions: the project is to be built in Zhangbaiwan New Industrial Demonstration Zone of Chengde. The location features convenient transportation and adjoins to No. 112 National Highway, 10km from Luanping County, 23km away from exits of Beijing-Chengde Highway and 1-hour drive away from Beijing. The Beijing-Tongliao Railway and the Zhangjiakou-Tangshan Railway which is being built pass through the Park. And stations for passenger and cargo trains are established in the zone. The water resources here is rich. And 27km of Luanhe passes here, with volume of runoff is 19 cubic meters per second. Shallow groundwater is enough to supply short-term water of the zone. And a water supply plant with a capacity of 100,000tons is being built. Now, there are three transformation stations with a capacity of 35KV, 110KV and 220KV separately. A transformation station of 500KV and the station of 35KV which is built especially for the zone are not being built for production. There is one transfer station and five gate stations, one sewage treatment plant with a capacity of 20,000tons/day to recycle water. And it is planned to build a sewage treatment plant with a daily capacity of 160,000tons. The first phase of this plant with a capacity of 60,000tons is finished.
项目进展情况:正在进行前期工作
Project Progress: initial work is in progress
合作意向:独资
Mode of Cooperation: single proprietorship