新型动力及储能电池项目招商引资
来源:网群国际 浏览:次
New Energy and Energy-saving Battery Project
项目名称: 新型动力及储能电池项目
Project Name: New Energy and Energy-saving Battery Project
项目内容:该项目拟选址在承德张百湾新兴产业内,建设年产储存规模为300万千伏安储能电池组件项目,收集光能、风能间歇性发电储备电能。
Project Plan: It is planned to be built in Zhangbaiwan New Industrial Park of Chengde, with an energy-saving battery component featuring annual energy saving capacity of 3million KV, to collect optical energy and wind energy to restore electric energy.
投资估算与资金来源:项目计划总投资1.2亿美元,资金全部企业自筹
Investment Estimation and Source of Fund: the total investment for the project is USD120million, all of which shall be collected by enterprise independently.
市场分析:由于新能源发电系统具有随机性和间歇性, 易对电网造成很大的冲击,引入储能系统后,就可以有效减 少对电网的冲击,提高电力质量,同时也能推动分布式新能源发电的上网,促进新能源的推广。据估算,在可再生能源领域,如果按照光伏和风能装机配备25%的储能,以1500元/千瓦的价格来计费中将占到15%,发展空间巨大;我国智能电网未来十年新增投资额在1万亿元左右,这些都将为储能电池带来巨大的市算,到2015年,储能市场将超过4000亿元。
Market Analysis: The randomness and intermittency of energy generating system through new energy can result in great shock to grid. However, after introducing the energy saving system, the shock to grid can be effectively reduced, the quality of electric energy is improved, the power-generating network through distributive new energy is enhanced and the new energy will be promoted. According to estimation, in renewable energy field, the development future is great provided that 25% energy saved is provided by photovoltaic and wind energy equipment if calculated based on the price of RMB1500/KV (accounting for 15%). All these will bring huge market benefits for energy-saving batteries. By 2015, energy-saving market value will surpass RMB400billion.
经济效益分析:项目建成后完成销售收入3000万美元,实现利税1000万美元
Economic Benefits Analysis: After being put into production, it will realize a sales income of USD30million and a tax income of USD10million.
建设条件:项目拟选址在承德张百湾新兴产业示范区内,该区交通便利,紧邻国道112线,距滦平县城10公里、京承高速滦平出口23公里,到北京仅1个半小时车程;京通铁路和正在建设的张唐铁路经过园区,并在区内设有客货两用站;水资源充沛,滦河流经27公里,径流量19立方米/秒;浅层地下水即可实现园区近期供水,规模为10万吨/日的供水厂正在建设中;区内现有35KV、110KV、220KV变电站各一座,承德西500KV变电站和园区专用35KV变电站即将建成投入使用;天然气管道在区内建设中转站一座、门站五个;现有处理能力为2万吨/日的污水处理厂一座,并可提供中水回用,规划建设处理能力为16万吨/日的第二污水处理厂1座,一期6万吨/日工程已开工建设。
Construction Conditions: the project is to be built in Zhangbaiwan New Industrial Demonstration Zone of Chengde. The location features convenient transportation and adjoins to No. 112 National Highway, 10km from Luanping County, 23km away from exits of Beijing-Chengde Highway and 1-hour drive away from Beijing. The Beijing-Tongliao Railway and the Zhangjiakou-Tangshan Railway which is being built pass through the Park. And stations for passenger and cargo trains are established in the zone. The water resources here is rich. And 27km of Luanhe passes here, with volume of runoff is 19 cubic meters per second. Shallow groundwater is enough to supply short-term water of the zone. And a water supply plant with a capacity of 100,000tons is being built. Now, there are three transformation stations with a capacity of 35KV, 110KV and 220KV separately. A transformation station of 500KV and the station of 35KV which is built especially for the zone are not being built for production. There is one transfer station and five gate stations, one sewage treatment plant with a capacity of 20,000tons/day to recycle water. And it is planned to build a sewage treatment plant with a daily capacity of 160,000tons. The first phase of this plant with a capacity of 60,000tons is finished.
项目进展:正在进行项目前期工作
Project Progress: initial work is being done.
合作方式:独资 合作
Cooperation Model: Single Proprietorship, Cooperation
项目合作:18361148798 或
温馨提示:本站提供免费发布服务,但对信息的合法性、实时性、真实性和完整性,不承担任何责任。名录资源由会员为向全球展示品牌形象上传,个人信息均经处理后发布,如有遗漏戓涉嫌侵权他人及不愿展示形象的,请将“该页网址和需修改及删除的内容”发至本站邮箱戓留言给我们处理。凡注册会员并发布信息或名录资源的,均可定期获得全球项目参考及合作机会。本站名录资源概不对任何第三方开放,更不提供如交换、出售及查询等服务!