29. Construction for Fresh-cutting Flowers Industrilization Demonstration Base in Zhangzhou
I. Project, construction scale and location: The project plans to build the new intelligent greenhouse with shading system, cooling system, power supply circuit and equipment, water supply and drainage system and other supporting facilities. The project is suggested to be located in
II. Construction reasons and conditions: The international competitiveness of Zhangzhou fresh-cutting flower industry is growing and its competitive advantages in the main export target markets is increasing but it does not have the competition strength against the urban areas with the developed flower industry due to its weak breeding, R&D and other relevant supporting industries. Therefore, the construction of the project is the need in the market development.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:50 million RMBV. Project economic and efficiency analysis: Predicted annual value of production 1.5 billion RMB.
VI. Project liaison unit: Changtai County Forestry Bureau
Contact: Ma Huachun
Tel:1351595***
30. Zhaoyang Reservior Construction Engineering in Zhangpu
I. Project, construction scale and location: The project will construct a reservoir with a total capacity of 43.81 million cubic meters and its highest dam is
II. Construction reasons and conditions: After the completion of the reservior, the guaranteed irrigation area of the Zhaoyang irrigation area can be increased 50000 mu to solve drinking water problem of 300000 people in the county and the surrounding townships and towns.
III. Preliminary work of the project: The project is under the feasible demonstration.
IV. Project total investment:1 billion RMBV. Project economic and efficiency analysis: The project belongs to the infrastructure project without economic benefits.
VI. Project liaison unit: Zhangpu County Bureau of Ocean and Fishery
Contact: Xu Qiusheng
Tel:1360755***
31. Famous and Excellent Aquacuture Demonstration Base in Zhangpu
I. Project, construction scale and location: Develop the famous and excellent aquaculture in
II. Construction reasons and conditions: Develop the environmentally friendly, resource-saving and healthy aquaculture industry and promote the formation of the modern aquaculture system with standardization, scale and industrialization.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:120 million RMBV. Project economic and efficiency analysis: Predicted annual economic benefit 300 million RMB.
VI. Project liaison unit: Zhangpu County Water Conservancy Bureau
Contact: Zheng Zhijian
Tel:1800695***
32. Establishment of the
I. Project, construction scale and location: Buy 14000 mu of the commercial forests in the region and project is suggested to located in Yunciao County Forestry Bureau.
II. Construction reasons and conditions: The constant optimization of the economic structure in the forestry is the material guarantee to realize the sustainable development of the forestry.
III. Preliminary work of the project: The project has finished the preliminary planning.
IV. Project total investment:700 million RMBV. Project economic and efficiency analysis: Good investment prospects.
VI. Project liaison unit: Yunxiao County Forestry Bureau
Contact: Zhang Zhiyun
Tel:1385924***
33.
I. Project, construction scale and location: The project constructs the safeguard measures on 154000 mu of the natural forests in the whole county and it is suggested to be located in the whole
II. Construction reasons and conditions: The project can improve the ecological environment, recover the forest vegetation, increase the forest resources, improve the forest coverage rate, keep water and soil, conserve the water resources and improve the climate and environment after its completion.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:77 million RMBV. Project economic and efficiency analysis: Efficiently improve the ecological environment.
VI. Project liaison unit: Yunxiao County Forestry Bureau
Contact: Zhang Zhiyun
Tel:1385924***
34. Boutique Fruits nd Vegetables Plantation
I. Project, construction scale and location: The project is the modern organic fruits and vegetables plantation with the traceability system to provide high-quality food materials for the starred hotels. The project is suggested to be located in Longwen District, covering an area of
II. Construction reasons and conditions: The urban families are entering a new stage of the upgrading of the consumption structure and put forward new requirements on the variety, quality and grade of the agricultural products, which provides the market space for the development of the boutique agriculture.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:100 million RMBV. Project economic and efficiency analysis: Predicted annual economic benefit 600 million RMB.
VI. Project liaison unit: Longwen District Guokeng Town Government
Contact: Guo Qiaomiao
Tel:1386086***
35. Project for the Electronic Commerce Logistics of Agricultural Products in Zhangzhou
I. Project, construction scale and location: The project is the construction of Zhangzhou Electronic Commerce Logistics Park of Agriculture Products mating with the perfect Zhangzhou cold-chain logistics system. The project is suggested to be located in Longwen District and covers an area of 500 mu.
II. Construction reasons and conditions: As a typical agricultural city, the modern agriculture of Zhangzhou has become the main force of its economic development with the rapid development of the agricultural economy. The project will build the largest electronic commerce logistics platform for the agricultural products in
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:320 million RMBV. Project economic and efficiency analysis: Predicted annual value of production 700 million RMB.
VI. Project liaison unit: Longwen District Bureau of Commerce
Contact: Yang Dongli
Tel:0596-212***
36. Project of Wonderland Modern Agricultural
I. Project, construction scale and location: Relying on the fruit resources in Changshan Overseas Chinese Economic Development Zone, the project will create the first dark night park in
II. Construction reasons and conditions: Changshan Overseas Chinese Economic Development Zone is the national high-quality fruits demonstration base with ten thousands mu for agriculture earning foreign exchanges, where fruit trees make a pleasant shade with aroma in four seasons and has a strong feature of the tropical
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:900 million RMBV. Project economic and efficiency analysis: Predicted annual economic benefit 500 million RMB.
VI. Project liaison unit: Tourist Administration of Changshan Development Zone
Contact: Wu Yaqiong
Tel:1865965***
37. Plant Extract Project with Five-million Annual Outputs
I. Project, construction scale and location: The project will purchase 900 sets/suits of the major production equipment. The project is planned to construct in
II. Construction reasons and conditions: This project belongs to the forest product deep processing project and its direct finished products, namely various plant extract, have the commercial development value and at present, our country has few enterprises to product so this project fills up the market vacancy.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:500 million RMBV. Project economic and efficiency analysis: The annual output of various plant extract is 500 tons.
VI. Project liaison unit:
Contact: Wu Qingquan
Tel:1370937***
38. Under-forest Economic
I. Project, construction scale and location: The project will develop the under-forest utilization of the under-forest plantation and cultivation, covering an area of 278000 mu. Project location is in Hua’an County.
II. Construction reasons and conditions: Hua’an County contains the greater economic development value due to its advantageous natural resources and the most under-forest economic products are the natural foods due to their original ecological characteristics so the consumer market is wide.
III. Preliminary work of the project: This project has carried out the preliminary feasibility study, the infrastructure is completed at the early stage so the construction of the project has begun to take shape.
IV. Project total investment:180 million RMBV. Project economic and efficiency analysis: Predicted annual economic benefit 900 million RMB.
VI. Project liaison unit: Hua’an County Forestry Bureau
Contact: Chen Xiangdong
Tel:1360507***
39. Integrated Demonstration Area of the Tea Industry Transformation and Upgrading
I. Project, construction scale and location: This project will construct the integrated demonstration area of the tea sightseeing and deep processing. The site selection of the project is
II. Construction reasons and conditions: The construction of this project is conducive to promote the transformation and upgrading of the tea industry, enhance the aggregation effect of the tea industry, optimize the industrial structure and promote the development of the tea plantation in the whole county.
III. Preliminary work of the project: The project is planning and designing the Oho Dragon Apex, Fujian Xiangxin Tea Co., Ltd, Xinghe Tea Specialized Cooperatives and Junyun Tea Industry Co., Ltd to construct the tea-plantation demonstration place for leisure and sightseeing tour.
IV. Project total investment:80 million RMBV. Project economic and efficiency analysis: The project can bring 100 million yuan of the economic benefits in a year.
VI. Project liaison unit: Hua’an County Agricultural Bureau
Contact: Chen Zhicong
Tel:1379982***
90. Construction Project of the
I. Project, construction scale and location: This project will be constructed into a modern industrial park about health maintenance and old-age pension integrated with planting, processing and tour and sightseeing. The site selection of the project is
II. Construction reasons and conditions: The construction party of the project will regard dendrobium officinale planting in imitating wild conditions under the Longan Tree as the main business and comprehensively promote the base construction and drive the development of other industries under its radiation. Adjacent to the county, the project is convenient for people in the urban and surrounding areas to go sightseeing with leisure, which not only can create economic benefits but also can obtain the good social benefits.
III. Preliminary work of the project: The project has finished the handover of the lands, which is leveling, and part construction of the round hill roads; the overall design, plane graph and approval of the environmental protection and other procedures of the project have been completed.
IV. Project total investment:200 million RMBV. Project economic and efficiency analysis: Good investment prospects.
VI. Project liaison unit: Zhangpu County Yangji Gardening Co., Ltd.
Project contact: Chen Jiadong
Tel:1500600***
Fax:0596-331***
Mailbox: zaqdjmb**[ta]**.com
Service
91. Southern Fujian Agricultural E-commerce Service Center in Zhangzhou
I. Project, construction scale and location: This project will construct the agricultural product service center, the agricultural product E-commerce operating center, the new media operating center, the financial service center, the brand exhibition hall, the modern agricultural warehouse, the inspection and quarantine center, the special agricultural products distribution network and the after-sales service center. The site selection of the project is
II. Construction reasons and conditions: As a large agricultural county, the whole
III. Preliminary work of the project: It is listed in the industrial development plan
IV. Project total investment:100 million RMB Sole proprietorship or joint venture is adoptable.
V. Project economic and efficiency analysis: Strong gathering of the industrial chains, wide irradiation range and good economic benefits.
VI. Project contact enterprise: Pinghe County Development and Reform Bureau Project contact: Zeng Pengcheng
Tel:0596-521***
Telephone number:1396009***
Fax:0596-523***
E-mail:fgj-ph**[ta]**.com
42. Pinghe Modern Cold-chain Logistics Base
I. Project, construction scale and location: This project will construct the frozen area, refrigeration block, processing area and package area for the agricultural and sideline products as well as the logistics information management center. The site selection of the project is
II. Construction reasons and conditions: As a large agricultural county, the whole Pinghe County has over 800000 mu of fruits planting area so the development of the Zhangzhou fruits and vegetables storage industry can protect the market price of crops in Fujian Province, reduce the economic loss in the process of the production and sales of agricultural products and promote the strategic adjustment of Zhangzhou agricultural structure.
III. Preliminary work of the project: It is listed in the industrial development plan
IV. Project total investment:300 million RMB Sole proprietorship or joint venture is adoptable.
V. Project economic and efficiency analysis: The annual sales revenue is expected to reach 1.3 billion yuan.
VI. Project contact enterprise: Pinghe County Bureau of Commerce Project Contact: Lan Zhengkun
Tel:0596-521***
Tel:1360698***
Fax:0596-523***
E-mail:phxwjj**[ta]**.com
43. Zhangzhou Rehabilitation Therapy and Human-body Exoskeleton Equipment Industrialization Base
I. Project, construction scale and location: This project will construct the rehabilitation therapy and exoskeleton equipment industrial park, rehabilitation instrument and exoskeleton equipment research and development base, rehabilitation medical apparatus and instrument storage and logistics base, experience exchange center of the rehabilitation medical apparatus and instrument, marketing promotion center and after-sale service center. This project’s planning land is 60 mu and the total building area is 100000 square meters. The site selection of the project is Shetou High and
II. Construction reasons and conditions: The field involved in this project is the key field in the modern service industry in
III. Preliminary work of the project: In the process of planning.
IV. Project total investment:Ca.200 million RMBV. Project economic and efficiency analysis: Single project output intensity ≥5 million RMB/mu; revenue≥100,000 RMB/mu.
VI. Project liaison unit: Zhangzhou Taiwan Businessman Investment Zone Economic Development Board
Project contact: Li Tingting
Tel: 677***
1359965***
E-mall: Address: 48736133**[ta]**com
44. Establish National
I. Project, construction scale and location: This project will construct the Tulou culture park, featured tourism commodity city, the Gaoshan Nationality folk culture village, four-star tourist hotel and other supporting facilities. The project is located in Xiandu Town Hua’an Count***
II. Construction reasons and conditions: Fujian Tulou (Hua’an) Tourist Area is the world cultural heritage as well as the national
III. Preliminary work of the project: In the process of business negotiation.
IV. Project total investment:300 million RMBV. Project economic and efficiency analysis: This project can increase 200 million yuan of tourism revenue for Hua’an every year after put into operation.
VI. Project liaison unit: Hua’an County Development and Reform Bureau Project contact: Yang Binglin
Tel:1385924***
Fax: 736***
E-mail:haxfgj**[ta]**.com
45. E-commerce Industrial Park of Hua’an Economic Development Zone
I. Project, construction scale and location: This project will construct 10000 square meters of the e-commerce trading center, 50000 square meters of logistics and storage, 6000 square meters of the parking lot and other supporting facilities. The site selection of the project is Hua’an Economic Development Zone.
II. Construction reasons and conditions: This project will be integrated with the e-commerce platform service, logistics network platform and the actual logistics enterprises after introduction to achieve the online and offline union of the production enterprises, logistics industry and e-commerce.
III. Preliminary work of the project: In the process of business negotiation.
IV. Project total investment:400 million RMBV. Project economic and efficiency analysis: The output value will not lower than 200 million yuan in the next year after the project is put into operation and reach 1 billion yuan in five years.
VI. Project liaison unit: Hua’an County Development and Reform Bureau Project contact: Yang Binglin
Tel:1385924***
Fax: 736***
E-mall: haxfgj**[ta]**.com
46. Integrated Project for
I. Project, construction scale and location: This project will construct the large-scale comprehensive tourism area by regarding the film and television shooting and tourism as the principal, integrated with the film and television tourism, relax on holidays and sightseeing. The floor space of the project is 500 mu.。The site selection is
II. Construction reasons and conditions: This project can expand the brand influence and visibility of Nanjing Tulou after its completion.
III. Preliminary work of the project: This project will attract all kinds of films, micro films and MVs of songs to shoot here and attract tourists to travel in the integrated area of the film and television base tourism every yea***
IV. Project total investment:100 million RMBV. Project economic and efficiency analysis: As the important sector of Tulou Travel, create Fujian·Tulou Film and Television Base to expand popularity and increase earnings.
VI. Project liaison unit: Nanjing County Shuyang Town People’s Government Project contact: Zhang Dexing
Tel:1360699***
Fax: 777***
E-mall: zhang.d.x**[ta]**.com
47. Leisure and
I. Project, construction scale and location: This project will build the leisure and sightseeing tea park with the Gaoshan Nationality ecological tourism integrated with sightseeing tea park, tea-picking experience area, tea ceremony exchange area, scientific research on tea area and Goashan Nationality living area. The project covers an area of 800 mu (mostly mountain) and the site selection is
II. Construction reasons and conditions: Based on Tulou tourism resources and Gaoshan Nationality ecological tea plantation industry, this project develops the leisure and sightseeing tea park with Gaoshan Nationality ecological tourism.
III. Preliminary work of the project: Three connections and one leveling, to be negotiated.
IV. Project total investment:200 million RMBV. Project economic and efficiency analysis: As the important sector of Tulou Travel, create the leisure and sightseeing tea park with Gaoshan Nationality ecological tourism to increase earnings.
VI. Project liaison unit: Nanjing County Shuyang Town People’s Government Project contact: Zhang Dexing
Tel:1360699***
Fax: 777***
E-mall: zhang.d.x**[ta]**.com