10. Annual output 500(set)industrial robot production line construciton project
I. Project, construction scale and location: Develop and produce industrial robots. Build industrial robot production line. The planing land is about 80mu and construcion area is 60000㎡. The project location is in Zhangzhou Kantian Ecnomic Development Zone.
II. Construction reasons and conditions: Equipment manufacturing industry is one of the four mainstay industries of
III. Preliminary work of the project: The submission and approval of the project land use is completed. It is in the process of land requisition and demolishing.
IV. Project total investment:500 million RMB.
V. Project economic and efficiency analysis: Annual value of production can reach 2 billion RMB after put in operation.
VI. Project liaison unit: Zhangzhou Lantian Economic Development Zone Administration Committee Project contact: Chen Jingyu
Tel:1390695***
E-mail:LT2106009**[ta]**.com
11. High-en medical facility production project
I. Project, construction scale and location: Annual output 600 sets fully automatic biochemical analyser,Annual output 400 sets semiconductor laser therapeutic instruments and other medical facilities. The planning land is 400 mu and construction area is 270000㎡. The project location is in Zhangzhou Jinfeng Ecnomic Development Zone.
II. Construction reasons and conditions: Emerging industry promoted by Zhangzhou industry transformation and upgrading.
III. Preliminary work of the project: In the process of planning and design IV. Project total investment:2 billion RMBV. Project economic and efficiency analysis: Annual production value of over 5 billion RMB after completion.
VI. Project liaison unit: Xiangcheng District
Project contact: Li Chaoqun
Tel:13605083***
Fax:0596-205***
E-mail:xcqfgj**[ta]**.com
12. Zhangzhou medicine outsourcing industrial park
I. Project, construction scale and location: The project is open to both Mainland and
II. Construction reasons and conditions: Biological medicine is one of the two backbones of modern pharmaceutical industry. Zhangzhou Taiwan Businessman Investment Zoneis national level development zone, close to
III. Preliminary work of the project: In the process of planning.
IV. Project total investment:Ca.500 million RMBV. Project economic and efficiency analysis: Single project output intensity ≥5 million RMB/mu; revenue≥100,000 RMB/mu.
VI. Project liaison unit: Zhangzhou Taiwan Businessman Investment Zone Economic Development Board
Project contact: Li Tingting
Tel: 677***
1359965***
E-mail:48736133**[ta]**com
13. Marine biopharmaceutical project
I. Project, construction scale and location: Extract effectively from marine organism and make it into capsule, oral solution, bablet and otherbiology medicne. The floor space of the project is 50 mu and the location is Dongshan CountyMarine Organism Science and
II. Construction reasons and conditions: Shangdong Economic and Technological Development Zone has complete infrastructure and favorable policies. It is the ideal place for the development of bio-pharmaceuticals.
III. Preliminary work of the project: Overall planning has been completed and it is in the process of technology R&D with colleges and universities.
IV. Project total investment:120 million RMBV. Project economic and efficiency analysis: Annual production value of over 0.4 billion RMB after put into operation with a revenue of 30 million RMB. Investment payoff period is 4 years.
VI. Project liaison unit: Dongshan Economic and Technological Development Zone Project contact: Ruan Junhua
Tel:0596-588***
Fax:0596-588***
E-mail:detdz**[ta]**dz.com
14. Pinghe pomelo biotechnology open project
I. Project, construction scale and location: Build production workshop and warehouse, integrated R&D building and other facilities. Establish production line of para-insulin material, folic acid and other biotech drug. The project location is
II. Construction reasons and conditions: Based on the raw material of Guanxin Pomelo, produce broad-spectrum antibacterial, antiviral,anti-aging products, household chemicals and beverage health food to meet the living concept of ecology, green and healty of modern people. This has great market prospects.
III. Preliminary work of the project: The project is pre-researchable.
IV. Project total investment:100 million RMBV. Project economic and efficiency analysis: After the the project is put in operation, the annual newly increased sales revenue will reach50million RMB. FIRR is estimated 40% and ROI is 12%,Investment payoff period is 3 years.
VI. Project liaison unit: Pinghe County Merchants Bureau Project contact: Chen Shenglin
Tel:1360508***
Fax:0596-523***
15. New material glass deep-processing project
I. Project, construction scale and location: Produce LOW-E coated glass, bend tempered glass, sandwich glass, hollow glass ,etc. The floor space is 100 mu, and the location is Shangdong Economic and Technological Development Zone.
II. Construction reasons and conditions: In recent years, environment friendly glass market has a great need and good benefit.
III. Preliminary work of the project: The project has finished the overall planning, location selection and land fiveoutlet-onedish.
IV. Project total investment:150 million RMB,sole proprietorship, joint venture or cooperation are all adoptable.
V. Project efficiency analysis: Annual production value of over 0.3 billion RMB after completion with a revenue of 400 million RMB,Investment payoff period is 4 years.
VI. Project liaison unit: Dongshan Economic and Technological Development Zone Photovoltaic Glass Industrial Park Project contact: Ruan Junhua
Tel:0596-588***
Fax:0596-588***
Emal:kfqjfj**[ta]**.com
16. Zhao’an infants and children appliance inspection center
I. Project, construction scale and location: Propose to build exposition trading center, education training center, service center and sofoth,covering a area of 3000mu. The projec location is Zhao’an Inudstrial Park.
II. Construction reasons and conditions: This project is for the completion of the coastal area infants and children cultural distribution and to promote the other parts of the west coast of the Taiwan Straits and the relatively concentrated investment area of
III. Preliminary work of the project: The infrastructure land is leveled.
IV. Project total investment:1.5 billion RMBV. Project economic and efficiency analysis: The estimated production value of the project can reach over ten billion RMB after completion.
VI. Project liaison unit: Fujian Zhao’an Industrial Park Magagement Committee Project contact:Shen Minghui
Tel:1330606***
Fax:0596-330***
E-mail:315140283**[ta]**com
17. Metallic material deep-processing industrial base project
I. Project, construction scale and location: Zircon powder R&D and production project, covering 300 mu, located in Zhao’an County Donghu Industrial Park.
II. Construction reasons and conditions:
III. Preliminary work of the project: The location selection has been finished and it is in the process of land acquisition.
IV. Project total investment:300 million RMBV. Project economic and efficiency analysis: Estimated annual production value of over 0.2 billion RMB after completion. It can provide 200 jobs.
VI. Project liaison unit: Zhao’an County Sidu Town People’s Government Project contact: Lin Zhiqiang
Tel:1875969***
Fax:0596-352***
E-mail:fjzasdjmb**[ta]**.com
18. Zhangzhou heat exchanger device production base
I. Project, construction scale and location: Build heat exchanger device production area, device maintenance service area, offices, living quarters and other supporting facilities. The planning construction area is 45mu, located in Zhangzhou Jinfeng Economic Development Zone.
II. Construction reasons and conditions: The application of enhancement heat transfer technology can not only save energy and prevent envioment, but aslo save investment cost. Zhanghou Lingang industry develops fast, including petroleum, chemical industry and energy. Heat exchanger device has a big market in Zhangzhou.
III. Preliminary work of the project: In the process of planning and design.
IV. Project total investment:400 million RMBV. Project economic and efficiency analysis: Annual production value of over 1 billion RMB after completion.
VI. Project liaison unit: Xiangcheng District Development and Reform Bureau
Project contact: Li Chaoqun
Tel:13605083***
Fax:0596-205***
E-mail:xcqfgj**[ta]**.com
19. Fabricated construction production base project
I. Project, construction scale and location: Build an integrated project combining production and sales of building blocks, sheet materials,box-type and other building materials. The planning land use is 35 mu, located in Zhangzhou Lantian Economic Development Zone.
II. Construction reasons and conditions: With high-efficient and energy-saving green architecture material, the project product features tremendous market potential.
III. Preliminary work of the project: The submission and approval of the project land use is completed. It is in the process of land requisition and demolishing.
IV. Project total investment:100 million RMBV. Project economic and efficiency analysis: After the project is put into operation, the annual production value will not be less than 300 million RMB.
VI. Project liaison unit: Zhangzhou Lantian Economic Development Zone Administration Committee Project contact: Chen Jingyu
Tel:1390695***
E-mail:haxfgj**[ta]**.com
20. Water-saving irrigation machinery project in
I. Project, construction scale and location: The project has the annual output of 200,000sets of water-saving irrigation equipment and its planning land covers an area of 38 mu, whose site selection is Sui’an Industrial Park of Zhangpu County.
II. Construction reasons and conditions: As the important agricultural machinery, the water-saving irrigation machinery plays an important role in the realization of the agricultural modernization, construction of a moderately prosperous society and promotion of the sustainable developmen***
III. Preliminary work of the project: Planning and constructing by relying on the basis of the existing
IV. Project total investment:200 million RMBV. Project economic and efficiency analysis: Stable needs in the product marketing and good economic benefits.
VI. Project liaison unit: Sui’an Industrial Park Project contacts: Tu Pinghui, Director
Tel:1390696***
21. Zhangzhou Intellectural Countryside Proj***
I. Project, construction scale and location: Construct the Zhangzhou rural intelligent and comprehensive information service platform and different exhibition halls to show the agricultural production technology, rural development achievement and the agriculture policies. The overall floorage of the project is 5000 square meters and its site selection is Xiangcheng District, Zhangzhou Cit***
II. Construction reasons and conditions: The computer data mining and the service mode of Internet, multimedia and cloud computing will be used through the platform, and it will be organically combined with connectivity and integration regarding the agricultural intelligent and comprehensive information service platform- “cloud platform”+ “intelligent terminal” as the carrier to connect the information service channel of city-county (district)-county (town)-village-households and realize “three rural issues (rural government affairs, service for peasants ad rural commerce) enter into villages to serve agriculture***
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:Ca.200 million RMBV. Project economic and efficiency analysis: The annual economic benefits are estimated to be 20 million yuan.
VI. Project liaison unit: Xiangcheng District Agricultural and Forestry Bureau Project Contact: Yuan Dehui
Tel:1370935***
22. Da’ao Fishing Port Economic Zone of
I. Project, construction scale and location: The project is integrated with the shelter and supplies of the fishing boats, gathering, distribution and processing of the aquatic products, leisure fishery, tourism and other relevant infrastructure. The project is suggested to be located in
II. Construction reasons and conditions: The project about the Da’ao Fishing Port Economic Zone of Dongshan County is planned to scientifically allocate and efficiently utilize the shoreline resources, further improve the use ratio of Da’ao Fishing Port in Dongshan County and its influence at home and abroad, accelerate the construction of the modern fishing port system with reasonable layout, form the new pattern of the economic development for the modern fishery that use the port to develop the region and link the port development with the regional development and promote the construction of the strong marine economy city.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:The total investment is 500 million yuan and PPP investment mode can be adopted.
V. Project economic and efficiency analysis: Predicted annual economic benefit 1 billion RMB.
VI. Project liaison unit: Dongshan County Bureau of Ocean and Fishery Project contact: He Weipai
Tel:1332845***
23. Chinese “
I. Project, construction scale and location: The construction content mainly includes the Chinese herbal medicine for health maintenance hall, Traditional Chinese Medicine (TCM) culture exchange center and the warehouses for Chinese herbal medicines, seeds, seedlings, agricultural means of production and farm tools. The project is suggested to be located in
II. Construction reasons and conditions: This project can strengthen the communication, exchanges and cooperation with Taiwan traditional Chinese medicine enterprises, strengthen the contacts and economic and cultural exchanges of the pharmaceutical personnel between Fujian Province and Taiwan and jointly establish “Mainland and Taiwan TCM Industrial Resource Sharing Platform” due to the special geographical characteristics and advantages towards Taiwan of Zhangzhou, which ensures the circulation of the high-quality medicinal materials and promote the development of TCM industry in Zhangzhou.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:Ca.670 million RMBV. Project economic and efficiency analysis: Predicted annual value of production 1.5 billion RMB.
VI. Project liaison unit: Hexi Town Government of Nanjing County
Contact: Huang Xiaodong
Tel:1380693***
24. Project of Eco-tourism Improvement for Fujian Tulou (
I. Project, construction scale and location: The connecting traveling roads, travel footpath in the scenic spot, ecological parking lot, scenic spot management room, travel toilets (including tool rooms) and the traveling ropeway will be newly constructed and transformed. The project is suggested to be located in
II. Construction reasons and conditions: As a comprehensive tourist destination with the strong regional driving force, Toulou Forest Park shall unite other ecological and tourism resources to play a leading role in the regional economic development of Zhangzhou. This project can efficiently increase the tax revenue and incomes of farmers after its completion.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:500 million RMBV. Project economic and efficiency analysis: Predicted annual economic benefit 300 million RMB.
VI. Project liaison unit: Nanjing County Forestry Bureau
Contact: Ma Zhanxing
Tel:1360699***
25. Improvement Project for the
I. Project, construction scale and location: The selenium-enriched green plum planting demonstration base mainly has the selenium-enriched green plum exhibition hall and science and technology hall covering an area of 1000 square meters as well as the mating infrastructure of the selenium-enriched green plum demonstration park. The site selection of the project is Xipu Operation zone,
II. Construction reasons and conditions: This project is integrated with base construction and leisure agriculture to drive the standardized construction of the selenium-enriched green plum planting in
III. Preliminary work of the project: The project has completed the delivery of lands and now it is declaring the project land while the earlier procedures are handled for the part infrastructure of the selenium-enriched green plum demonstration base IV. Project total investment:30 million RMBV. Project economic and efficiency analysis: The construction and development of the project will drive the standardized planting of selenium-enriched green plum in
VI. Project liaison unit: Hongxing Township Government of Zhao’an County
Contact: Chen Zhizhong
Tel:1362592***
26.
I. Project, construction scale and location: Regarding the celebrity plantation as the core, this park has newly built a series of electronic explicating platform and the honey pomelo zone integrated with multifunction, such as comprehensive service, industrial coincidence, tourist reception, commercial service, specialty catering, cultural creation and club exhibition and sell. The project is suggested to be located in
II. Construction reasons and conditions: This project will further change the development way of the honey pomelo industry, promote the integrative development of the agriculture and tourism and boost the orderly updating of the greenways on both sides of the river.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:300 million RMBV. Project economic and efficiency analysis: Predicted annual economic benefit 50 million RMB.
VI. Project liaison unit: Pinghe County Development and Reform Bureau
Contact: Lin Bin
Tel:1332881***
27. Construction project of the High-tech Agriculture Demonstration Zone in
I. Project, construction scale and location: The project will build the different functional areas for the high-priced vegetable production, special industrial crops production, standardized aquaculture, agriculture products processing and circulation and ecological leisure and agricultural tourism. The project is suggested to be located in
II. Construction reasons and conditions: Dongyuan Town has over 20000 mu of cultivated land now so the project can lead the agricultural leading enterprises and the business entities on the upstream and downstream of the industrial chain to have the concentrated development in the innovation park and the core area of the demonstration base and its surrounding areas, then promote the leading industries in the park and the competitive industries to be greater and stronger and enhance the radiating and driving function of the industrial park.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:150 million RMBV. Project economic and efficiency analysis: Predicted annual economic benefit 300 million RMB.
VI. Project liaison unit: Dongyuan Town Government of Longhai City
Contact: Guo Shaofeng
Tel:1360696***
28. Colorful World•Flowers Blooming
I. Project, construction scale and location: The project mainly builds the exhibition and trade center for the cultural and creative products of flowers, flowers research and exhibition center, flower studio city, Zhangtai flower industry cooperation and exchange center, comprehensive service platform and the mating functional areas. The project is suggested to located in
II. Construction reasons and conditions: Transform and improve the “Flowers Village” and the narcissus planting base, extend “Ecological corridor of Southen Min culture” to its surrounding areas for development and construction and focus on the development of flower culture creativity, “Internet+” modern flower industry and leisure toursim and vacation tour to make the cultural creativity and “Internet+” become a new growth point of Zhangzhou flower industry.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:1.2 billion RMBV. Project economic and efficiency analysis: Predicted annual economic benefit 600 million RMB.
VI. Project liaison unit: Jiuhu Town Government of Longhai City
Contact: Xu Zhiming
Tel:1896528***